Investors

Two products from one feedstock.

EIREX has spent more than 23 years engineering hydrodynamic cavitation. That work now drives a process that co-produces hydrogen and hydrogen peroxide from water, on site. We are raising a milestone-based round to build and validate the pilot.

Request the investor packMeet the team
The round
~$3Mpilot round
9 moto measured data
4milestone gates
2US patents granted

Funds are released against milestones. Each stage ends with a result partners can check.

The problem

Single-product hydrogen competes on price alone.

Most green hydrogen routes make one product, so every project lives or dies on the cost of hydrogen. That has kept many of them from reaching commercial economics.

Our approach

A second revenue stream from the same water.

Every kilogram of hydrogen comes with about 17 kg of hydrogen peroxide, an industrial chemical used in electronics, water treatment, pulp and paper, and chemical synthesis. Made on site, it removes the shipping and storage of a hazardous chemical. We don't claim cheap energy. The co-product carries the business case.

Foundation

What's already in place.

23+ years of R&D

Four cavitation prototypes across mining, oil sands, heavy oil and plastics.

Granted US patents

US 9,752,082 (viscosity reduction) and US 11,266,995 (rock disintegration). Hydrogen patent documentation complete, filing in progress.

Experienced team

Engineers and a hydrodynamicist with 40+ years each in industry and research. See the team.

Honest evidence

Every claim sorted into demonstrated, predicted and to be measured. See the ledger.

Use of funds

What the round pays for.

Every dollar goes toward one outcome: a working pilot with independently measured data. The line-item budget is in the investor pack.

01

Engineering team

Design, build and run the pilot.

02

Pilot hardware

Rotor, pump skid, separation and instrumentation.

03

Pilot site

A facility set up to build and operate the unit.

04

Verification & IP

Third-party testing and the hydrogen patent filing.

Milestones

Nine months, four gates.

Months 1–2

Design

Final pilot engineering. File the hydrogen production patent.

Months 3–4

Build

Fabricate rotor, pump skid and separation.

Months 5–7

Integrate

Assemble, instrument and commission.

Months 8–9

Validate

Independent third-party verification of hydrogen, peroxide and energy data.

Target markets

Who buys the output.

Get the investor pack.

Deck, pilot plan and use of funds. Technical details follow under NDA. Pick "Investor" in the form and it reaches the founder directly.

Request access